|
|
 |
 |
 |
-
MARCH 2008 - Stafford Leisure Centre was opened to the public. F T Leisure designed, supplied, installed and commissioned the Water Treatment and Filtration systems for a 25m competition pool and learner pool and also installed an Aquaterr Moveable Floor system within the learner pool. The client for the project was Stafford Borough Council and the Main Contractor was Alfred McAlpines (now Carillion Plc). The project was finished on time and on budget.
-
MAY 2008 - F T Leisure has been appointed to carry out the design, supply, installation and commissioning of the Water Treatment and Filtration systems, Water Features, Wave Machine and Flumes at the Whitley Bay Leisure Centre. Our works are part of a major refurbishment of the this 1970's facility.
-
MAY 2008 - F T Leisure has been appointed to carry out the design, supply, installation and commissioning of the Water Treatment and Filtration systems at Malvern College. This is a new sports facility for the college.
-
JUNE 2008 - F T Leisure has been appointed to carry out the design, supply, installation and commissioning of the Water Treatment and Filtration systems at Maghull Leisure Centre. This is a new facility for Sefton MBC, which will replace the existing Deyes Lane Swimming Pool.
   |
|
 |
 |
|
 |
|
|
|
|
|
|
|