Contract Summary
The design, supply, installation and commissioning of a 16.67m x 8m moveable floor system within the Studio Pool. F T Leisure also designed and installed the water treatment and filtration systems in the studio and 25m 8 lane competition pool.
ARC Leisure Centre
Contract details
Client
Derbyshire Dales District Council
Consultant
Desco Consultancy
Main contractor
Morgan Sindall
Completed
August 2011
Contract Summary
The design, supply, installation and commissioning of a 17m x 9.2m moveable floor complete with protective ramp. The floor was installed in the 25m main competition pool. F T Leisure also designed and installed the water treatment and filtration systems for both pools and water features in the splash area (see water treatment section of project gallery).
Billingham Forum
Contract details
Client
Stockton-on-Tees Borough Council
Architect
Devereux Architects
Main contractor
Morgan Sindall
Completed
June 2011
Contract Summary
The existing 33.3m main pool was split into a 25m ASA standard competition pool and separate activity pool using a 2m wide static boom system. A moveable floor was then added to the activity pool to optimise the functionality of this swimming area.
Northumbria University Sports
Contract details
Client
Northumbria University
Architect
Atkins Global
Main contractor
Sir Robert McAlpines
Completed
April 2010
Contract Summary
The design, manufacture and installation of a 13m wide by 10m long moveable floor system complete with a 13m wide by 4 long protective ramp. The floor travels from static water to 2.0m deep.
Manchester Aquatics Centre
Contract details
Client
Manchester City Council
Main contractor
ISG Regions
Completed
March 2009
Contract Summary
The replacement of 108 stainless steel cables on the 4No moveable floors and 2No booms. The project was carried out of a 4 week period by our HSE diving teams, working on night shifts, to prevent any disruption to the pool usage.
Evesham Leisure Centre
Contract details
Client
Wychavon District Council
Main contractor
Galliford Try Construction
Completed
June 2009
Contract Summary
The design, supply and installation of a 13m x 7 moveable floor system in the learner pool. The centre also contains a 25m 5 lane main pool. F T Leisure also completed all water treatment and filtration systems.