
In July 2010, F T Leisure completed the full replacement of the water treatment and filtration systems on the 25m 6 Lane main pool and separate 16m x 7.5m Learner pool at Meadowside Leisure Centre, Burton on Trent.
In January 2010, F T Leisure successfully completed the installation of UV systems on the main leisure pool and indoor whirlpool at the infamous Splash Landings Hotel aquatic facility, Cariba Creek. Situated within Alton Towers, this themed leisure pool facility was originally designed to incorporate Ozone systems; due to continued problems with these units, F T Leisure were appointed to design and install an alternative sterilant. The UV units used were manufactured by Hanovia UK.
The installation of new water distribution pipework on the 25m and Learner Pool, including suction, delivery and a new header pipe from the existing scum channel. Other works included new outlets from the scum channel (core drilled), a new levelling tank system on both pools and new circulating pumps.
F T Leisure have completed the refurbishment of the water treatment and filtration system at Chorlton Leisure Centre (Manchester). The facility, which was built inthe 1930's, contains a 22.4m x 7.8m main pool, constructed from concrete and finished in glazed bricks. Our contract included the design and installation of a complete new water treatment and filtration system, to meet current standards and guidelines.