Center Parcs Whinfell
Client: 
Center Parcs 
Contractor: 
SDC Construction 
Architect: 
Holder Mathias Architects 
Date: 
23rd March 2023
The design, supply and installation of the water treatment and filtration system and pumping systems for the exciting new cyclone ride at CP Whinfell. The ride was designed and installed by Van Egdom.
