Deansgate Square, Manchester

Contractor:
Renaker Build

Architect:
WSP

Date:
11th December 2025

Design, supply and installation of water treatment and filtration systems for 20m x 8.75m lap pool and separate Vitality pool with air and water features. The pool tanks are welded and brushed stainless steel from our steel pool tank partner, https://www.berndorf-baederbau.com/