FT Leisure were involved with the refurbishment of the 15m x 10m swimming pool water treatment and filtration system and provided the disabled access system. Wiltshire Council invested £2.5 million…
Category:
The state-of-the-art facilities in the £42 million iconic building includes installation by FT Leiure of the main 50m swimming pool, wave, flume and teaching pool water treatment and filtration systems….
Category:
FT Leisure were appointed to design, install and commission the 25m 8 lane pool and diving pool water treatment and filtration systems. We also installed a moveable floor system and…
Category:
