Plymouth Life Centre

Contractor:
Balfour Beatty

Architect:
Archial Architects

Date:
2nd May 2012

POOL SYSTEMS:

  1. 50m 10 lane FINA competition pool
  2. Competition diving pool for 10m platform, complete with pneumatic diver training system
  3. Freeform leisure pool complete with:
    1. GRP ride
    2. Water features
    3. Air features
  4. Spa pool with water and air features

FTL SERVICES:

Design, supply, installation and commissioning:

4No Water treatment and filtration systems

Pneumatic diver training system

Water features

Air features

Ride hydraulics

 

COMMERCIAL:

Project value: £42m

FTL sub-contract: £0.95m

 

PROJECT TEAM:

Client: Plymouth City Council

Principal Contractor: Balfour Beatty

Architect: Archial Architects

Engineer: Arup UK

Pool consultant: Devin Consulting

 

OTHER INFORMATION:

Project completion: Oct 2012