New Barnet Leisure Centre in North London has become the second new facility to open its doors following a £44.9m investment by Barnet London Borough Council (BLBC). FT Leisure delivered the swimming pool water treatment and filtration systems for the 25m 6 lane pool and learner pool.
Category:
25m 6 lane main pool. FT Leisure designed and installed the water treatment and filtration system.
Category:
FT Leisure provided new water treatment and filtration systems for the existing 25m 6 lane pool and combined learner pool. We also designed and installed a new acrylic Spa pool. Due to structural concerns with the existing pools, they remained full during the refurbishment. We therefore provided a temporary filtration system during the works to maintain the pool water.
Category:
